Postby G3750 » Mon Sep 07, 2020 8:18 pm
Updated 9/7/2020:
Worked on the track at the west end of the bridge and got it installed permanently (I hope). There is a very mild curve there that I tried to make using 3 slightly bent pieces of straight track. Unfortunately, I wasn't able to do it properly. It didn't look very good, so I took it up and used a small cut section of O-128 between two sections of straight track. I ran the Decapod over it at speed (at least as fast as a Decapod might expect to go) as an experiment. I had to shim sections of adjoining track to get them to the right levels, but it turned out OK. I also ran the Decapod in reverse over the track section as well. I think we are good to go!
Next step is to get the passenger siding down permanently. After that I will move a bit farther west, installing the Wye (Switch #37. Then we will turn our attention to the eastern shore, hanging the conduit, cutting and placing the slight curves there, and installing the track feeders.
George
What is a 'Conservative'? "Someone who wants society and policy to recognize objective reality- economic, biological, and historical."
—Katy Faust