So while posting and activity on the PRR Panhandle thread has subsided for the near future, I have been busy with the track plan for PRR Panhandle 2.0. Several things have happened to influence my thinking:
- The Kalmbach publication Model Railroad Planning 2017 became available recently and I had a chance to study Neal Schorr's Middle Division layout (as well as visit it). In the rural areas (particularly the WV approach to the bridge), I want to model the mainline more prototypically. That will mean planning for line poles, culverts, an underpass, and the adherence to a slightly elevated (on a fill) mainline with a 2:3 (rise to run) slope.
- My bridge supplier came back with preliminary drawings on the approach spans. The possible lengths of these spans will influence the track placement.
Based on the above, I am going to create a side view drawing of the entire bridge span to determine what looks right (proportionally). I want to see what the overall length turns out to be. A double-check of actual measurements would seem to be in order.
Right now, it's looking as if I will straighten out the entire mainline run (with the bridge) on the back wall and position it on a slight 5-10 degree angle from the wall (not parallel). The mainline will be closer to the back wall on the right (Weirton side) and farther away on the left (Steubenville side).
If time permits, I will create and post all the changed drawings, but this tells you my thinking.
George