Once again, life got in the way of progress. Some minor items got done:
- The final measurements for Backdrop #1 were computed. A few minor cuts were made to the backdrop so that it would fit on the wall.
- Angle brackets were installed along the top outer edge of the layout. These will prevent the backdrop from falling between the layout and the room wall.
- Additional angle brackets and some paint were purchased.
I had planned to put at least 1 backdrop in place, but that fell through due to circumstances beyond my control. With my carpel tunnel surgery scheduled for tomorrow, backdrop installation is at least 2 weeks off. I will have to find some other lightweight items to work on in the mean time.
George