Updated 2/5/2015:
I'm making slow progress re-tracing wires and re-labeling them. I've found a product called "Glue Dots" that has peelable double-sided strips of glue that I'm using to re-attach the Avery paper labels to the Waytek plastic ID plates. I'm trying to do this for attached ID plates under the layout. What a PITA!

Next layout has to be at least 4' off the floor, so I can get around on a wheeled chair / stool. Adequate lighting under the layout might also be a good investment, but I'm not sure about that. Good chance that will be located in the wrong spots - Murphy's Law.
I'm also updating my spreadsheet of Power Districts and their connections. The double cross-over had a bunch of track feeder pairs. These came from the Eastern Distribution Panel to their own barrier strip just under the eastern end of the bridge. With the reduction in connections, I may be able to remove that barrier strip and possibly another. That will simplify the wiring runs and reduce clutter in that area. The same general spot is where Switch Bus #2 will be attached, so reclaiming that real estate will be a good thing.
I need to get the track feeders for the bridge installed - one for each of the 2 tracks. Those will be on the eastern side of the bridge. There will be 1 insulated control rail on the bridge connected from the eastern side. That will be on the northernmost track (Track 1 as the Pennsy would number them North to South) and provide input to the Westbound signal on the Weirton side of the bridge.
There will be 1 insulated control rail on the bridge connected from the western side. That will be on the southernmost track (Track 2) and provide input to the Eastbound signal on the Steubenville side of the bridge.
We'll see how far we get this weekend.
George