Postby ScaleCraft » Sun Jun 04, 2017 12:38 am
Yes, two-rail.
I am getting close to sorting out all the rest.
I now have 400 feet of straight, cleaned of ballast GarGraves track, bundled in ten section units.
Not counting the neatly curved sections saved as such, nor the boxes of shorter sections.
51 switches, all cleaned of ballast.
Bags of pins for the GarGraves.
A big fruit box of 14 gauge wire.
Two All-Trols.
A big 3/4" ply board with two 24VAC, 275VA transformers and a plug strip, to replace the current ZW for the All-Trols.
Three rail track cleaning car (Northeast Trains) and cleaner solution.
Sorting through boxes and bags of parts...and all the scenery stuff, ground foam, plaster, sifters, dyes, not even sure what's all there, no time to look, and several boxes of all the building bits left over from him building false fronts...so I can have false backs.
Dave....gone by invitation