- Got a lot of my work area cleaned up. Have two work surfaces ready to go for projects.
- Completed my DC accessory buss drawing. I am using 2-conductor disconnects (with 12" black & red leads) to attach the buss drop to the accessory (house or structure). Inside the accessory will be the terminal strip that distributes power to all the house's lights.
- Organized a second storage box for electrical components. Found 2 DC fans driven by 12 volts that I can use to cool down components or power supplies if need be.
- Cleaned up a number of work spots on the layout.
- Sent requests off for photos of the Mill Administration Building and the Quality Control Lab structure.
- Installed the 2 MTH floodlight towers in the proper (hopefully final) positions.
Got a few things done, not a ton, but some forward progress was achieved.
George