aterry11 wrote:The PRR guys will hate that as I cant find a photo of a PRR E8 with even a lever on the side of the hatch. There appears to be a lift ring in that location in most photos. In all the looking I cant find one photo that shows that part on the roof near the winterization hatch on any road. Simple suggestion Omit it on all units it is easier to add them if required that to remove and try to match paint.
Prototype roof shots are difficult to find. That said, I looked at a friend's Key Imports brass PRR E8, and the lever is there hiding behind the train phone antenna. It is tiny, but it is there. If it were not, I doubt it would have been missed, but you never know when dealing with the rivet counting crowd! Considering ALL the first batch of 3Rd Rail E7's came through with shovel nose/streamline???? type pilots (like those on the E1 through E6's) which were totally incorrect for a LARGE number of roads, I would worry more about something like that, than what will likely end up being a little blob of plastic on the roof.
Rich (opinion)
Anyone know the correct name for that swoopy pilot?